US PPI — Plumbing Fixture Fitting and Trim Manufacturing
Producer Price Index for plumbing fixture fittings and trim.
417.588+0.0% m/m+4.9% y/y+30.1% 5y
Sep 2026 value · Next print expected around Nov 2026 · Source: BLS
Price history
Sep 2026 · latest417.588+30.1%since Sep 2021
Move along the line to read any month
Copy the values
Paste straight into Excel, Google Sheets or an email. Spreadsheet format lands as two columns.
Range
Format
Preview13 rows, newest first. Click a value to copy it.
Month
Value
Change m/m
Sep 2026
+0.0%
Aug 2026
+0.0%
Jul 2026
+0.0%
Jun 2026
+0.0%
May 2026
+0.0%
Apr 2026
+0.0%
Mar 2026
+0.4%
Feb 2026
+0.0%
Jan 2026
+1.4%
Dec 2025
+3.0%
Nov 2025
+0.0%
Oct 2025
+0.0%
Sep 2025
+0.0%
Same numbers as the chart, straight from BLS. Dates are the first of each period, the way BLS reports them.
How it's built
Plumbing fittings rose 4.9% over the last 12 months, but all of its main inputs rose faster: copper and brass mill shapes +30.0%. That cost pressure may still pass through to prices.
From Jan 2017 to Sep 2026 the index went from 269.6 to 417.6, a change of +54.9%.
Highest reading in that period: 417.6 in Mar 2026. Lowest: 269.6 in Jan 2017.
Largest one-month rise: +6.8% in Jan 2022. Largest one-month fall: -1.6% in Aug 2022.
For a clause that resets its base every year, a 10% cap or floor would have limited the adjustment in 1 of the last 36 months.
Use it in a contract
Draft clause citing this series
A starting point citing this series by name and code. Replace the bracketed terms with your contract's actual scope before use.
The [affected portion] of the Contract Price shall be adjusted using US PPI — Plumbing Fixture Fitting and Trim Manufacturing (BLS series PCU332913332913), published by BLS.
Base Period: the index value published for September 2026 (or the month of contract signing, if different) is the Base Value.
Adjustment: at each Adjustment Date, the Current Value is the most recently published three-month average of the index (the Averaging Window). The Escalation Factor equals Current Value divided by Base Value.
Cap: the Escalation Factor applied under this clause shall not exceed 1.10 or fall below 0.90 (a 10% cap and floor) in any single Adjustment Date, regardless of the index's actual movement.
[Replace bracketed terms with your contract's actual affected-portion definition and adjustment-date schedule before use. This is a drafting starting point, not legal advice.]
The standard index for finished plumbing trim, faucets, fittings and fixtures, as installed in a building fit-out contract rather than the pipe that feeds them.
Price escalation in a construction contract is a clause that adjusts the contract price for movements in the published price of a named material, fuel, or labor cost after the bid. It shifts material-price risk from the contractor to the owner, within a defined base period, formula, and cap.
Let Escalake run this clause for you
Escalake tracks US PPI — Plumbing Fixture Fitting and Trim Manufacturing, applies your formula, and gives both sides a number they can confirm, no spreadsheet required.