US PPI — Power, Distribution, and Specialty Transformer Manufacturing
Producer Price Index for electrical transformers, updated monthly.
475.065+0.0% m/m+7.8% y/y+50.4% 5y
Sep 2026 value · Next print expected around Nov 2026 · Source: BLS
Price history
Sep 2026 · latest475.065+50.4%since Sep 2021
Move along the line to read any month
Copy the values
Paste straight into Excel, Google Sheets or an email. Spreadsheet format lands as two columns.
Range
Format
Preview13 rows, newest first. Click a value to copy it.
Month
Value
Change m/m
Sep 2026
+0.0%
Aug 2026
+0.0%
Jul 2026
+4.0%
Jun 2026
+0.0%
May 2026
+0.5%
Apr 2026
−0.4%
Mar 2026
+0.0%
Feb 2026
+0.0%
Jan 2026
+0.0%
Dec 2025
+0.0%
Nov 2025
−0.6%
Oct 2025
+4.0%
Sep 2025
+0.0%
Same numbers as the chart, straight from BLS. Dates are the first of each period, the way BLS reports them.
How it's built
Transformers rose 7.8% over the last 12 months, but all of its main inputs rose faster: cold rolled steel sheet and strip +36.9%, copper wire and cable +30.8%. That cost pressure may still pass through to prices.
From Jan 2017 to Sep 2026 the index went from 231.5 to 475.1, a change of +105.2%.
Highest reading in that period: 475.1 in Aug 2026. Lowest: 231.5 in Jan 2017.
Largest one-month rise: +6.0% in Jun 2021. Largest one-month fall: -2.5% in Oct 2022.
The year-over-year change stayed within 10% either way in each of the last 36 months, so a 10% annual cap or floor would not have been reached.
Use it in a contract
Draft clause citing this series
A starting point citing this series by name and code. Replace the bracketed terms with your contract's actual scope before use.
The [affected portion] of the Contract Price shall be adjusted using US PPI — Power, Distribution, and Specialty Transformer Manufacturing (BLS series PCU335311335311), published by BLS.
Base Period: the index value published for September 2026 (or the month of contract signing, if different) is the Base Value.
Adjustment: at each Adjustment Date, the Current Value is the most recently published three-month average of the index (the Averaging Window). The Escalation Factor equals Current Value divided by Base Value.
Cap: the Escalation Factor applied under this clause shall not exceed 1.10 or fall below 0.90 (a 10% cap and floor) in any single Adjustment Date, regardless of the index's actual movement.
[Replace bracketed terms with your contract's actual affected-portion definition and adjustment-date schedule before use. This is a drafting starting point, not legal advice.]
One of the strongest indexed components in data-center, transmission, and substation contracts, a real manufactured product with a live monthly survey.
Split the contract by what is being built: towers, fiber, data centers, or core network equipment. Towers, fiber and data centers have no single official price index for the finished project, so use a weighted composite of real cost inputs. Data centers have the best coverage: transformers (PCU335311335311) and switchgear (PCU335313335313) both have real, live BLS indices.
Split the contract by asset type: solar, wind, transmission, substations, or water. Transformers (PCU335311335311) and switchgear (PCU335313335313) have real, live BLS price indices. Solar, wind, and power line construction do not, so those need a weighted input composite instead.